With the rapid development of civil aviation infrastructure in China, airport runway and apron construction projects are increasing steadily. In Zhengzhou, a major transportation hub in Central China, a new airport apron paving project was launched to improve aircraft parking efficiency and operational safety. The project required high-precision concrete paving equipment capable of delivering smooth surfaces, stable thickness, and long-term durability.
To meet strict aviation construction standards, the client searched for a reliable concrete slipform paver with proven performance and professional technical support.
The client is a professional airport infrastructure contractor based in Zhengzhou, China, specializing in runway and apron construction. The project focused on paving a 5-meter-wide concrete surface for airport parking aprons and taxiway connections.
Key requirements included:
High surface smoothness
Accurate paving thickness
Stable continuous operation
High construction efficiency
Compliance with airport engineering standards
After detailed technical communication, we recommended the SMC-6600 Concrete Slipform Paver, configured specifically for 5-meter-wide airport pavement construction.
Model: SMC-6600 Slipform Paver
Paving Width: 5000 mm
Paving Thickness: 180–350 mm
Paving Speed: 0–7.5 m/min
Engine Power: 177 kW
Vibration Frequency: 0–167 Hz
Control System: CAN-Bus Automatic Leveling
Quantity Supplied: 1 Unit
The machine was customized with an enhanced vibration system and precision leveling sensors to ensure uniform compaction and surface flatness.
We also provided on-site installation guidance, operator training, and remote technical support to guarantee smooth project execution.
During construction, the SMC-6600 operated continuously with high stability. The four-track hydraulic drive system ensured smooth movement even under heavy concrete loads. The intelligent control system maintained accurate paving alignment and thickness.
The project achieved:
High-density concrete compaction
Excellent surface finish
Reduced labor requirements
Improved construction efficiency by over 30%
The apron surface fully met airport engineering acceptance standards.
After project completion, the client highly praised the machine’s performance and reliability.
“The SMC-6600 slipform paver delivered outstanding paving quality and stable operation. Its automatic control system greatly reduced manual adjustments. We are very satisfied with the cooperation and technical support.”
This Zhengzhou airport apron paving project demonstrates the strong performance of the SMC-6600 concrete slipform paver in aviation infrastructure construction. With precise leveling, powerful vibration, and intelligent control, the machine provided an efficient and cost-effective paving solution.
Key Advantages:
High precision and stability
Excellent surface smoothness
Low maintenance cost
Strong adaptability to airport projects
This successful case further strengthens our position as a professional slipform paver manufacturer and reliable global supplier.
![]()
![]()
![]()